Trip cost/amount paid/balance due
planned
Kristen Salinas
Trip Suite should be programmed to "do the math" to update the Balance Due any time the Total Fare box is modified. Leaving it to the advisor or coordinator to haul out the calculator and refigure amounts is exposure to error at the very least, and a considerable waste of time. The two numbers separated by a slash provide very little meaning. That area could be better utilized to show total cost of trip/amount paid/balance due.
Jacey Jones
planned